Close
Igniting Ideas For impact

Embarking on a transformative journey through six chapters, we traverse India's landscape, exploring pioneering startups and their revolutionary...

9 months

800 Trains Set in a Few Clicks: Railways Introduces Asia’s Largest Interlocking System

The cost of installing the new system is a whopping Rs 39 crore. This new technology will allow the path of a train to be set in a way that it has to cross several tracks.

800 Trains Set in a Few Clicks: Railways Introduces Asia’s Largest Interlocking System

With growing cases of derailment in the past few months, the South Eastern Railway (SER), in a move to increase capacity and ensure the safer running of trains, has replaced the route relay interlocking (RRI) system at Kharagpur with Asia’s largest solid state interlocking (SSI) system.

This technology that is set to come into effect from Sunday will allow station masters at Kharagpur to set 800 different routes for trains in a matter of a few clicks.

800 trains set in a few clicks- Railways introduces Asia's largest interlocking system
Source: Wikimedia Commons

This is in stark contrast to the vintage RRI system which only allowed operators to set a mere 423 routes.

Speaking to the Times of India, Principal chief operations manager of SER, Suchitto Kumar Das said, “This will be Asia’s largest SSI system. The RRI system is of pre-1980 vintage and has crossed its codal-life.”

The cost of installing the new system is a whopping Rs 39 crore. This new technology will allow the path of a train to be set in a way that it has to cross several tracks.

The prime benefit of the interlocking system is that it ensures no cross movement takes place during the crossings, to avoid disastrous collisions.

“The SSI system is much more dependable than the older ones. We have been carrying out tests on this system for the last 7-8 months,” said Das.

The project that was kickstarted at the Kharagpur yard on November 4 will continue its work, till Sunday. It is likely, that passengers may face severe disruptions in the suburban rail services from Friday, once the SER begins to switch over to the SSI system from its current RRI system.

During the work, the SER will make platform numbers 7 and 8 at Kharagpur operational. To increase capacity, it will also link a third line from Howrah and a second line from Midnapore to the Kharagpur yard by Sunday.


Read more: Indian Railways to Use GPS-Enabled Safety Devices to Help Guide Trains Through Fog


As per SER’s Chief passenger transportation manager, Soumitra Majumdar, over 116 pairs of trains originate, terminate or pass through Kharagpur every day.

With the dawn of the new technology in place, three signal cabins will become inessential, and the requirement for cabin masters will decrease.

“We’ll require more station masters to operate the system. Some trains may be delayed, but we don’t anticipate any major trouble after Sunday,” he told the publication.

Like this story? Or have something to share?
Write to us: [email protected]
Connect with us on Facebook and Twitter.
NEW: Click here to get positive news on WhatsApp!

This story made me

  • feel inspired icon
    97
  • more aware icon
    121
  • better informative icon
    89
  • do something icon
    167

Tell Us More


We bring stories straight from the heart of India, to inspire millions and create a wave of impact. Our positive movement is growing bigger everyday, and we would love for you to join it.

Please contribute whatever you can, every little penny helps our team in bringing you more stories that support dreams and spread hope.

Support the biggest positivity movement section image Support the biggest positivity movement section image
Shorts

Shorts

See All
 
X
 
Sign in to get free benefits
  • Get positive stories daily on email
  • Join our community of positive ambassadors
  • Become a part of the positive movement